IAC logo
IAC Assessment: OK1030
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1030
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2020
Principal Product Treated wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 10
Plant Area (Sq.Ft.) 897,697
Annual Production 1,825,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $327,036 4,955,085 kWh $0.07
Electricity Demand $79,320 11,380 kW-months/year $6.97
Natural Gas $20,794 5,941 MMBtu $3.50
TOTAL ENERGY COSTS $427,150
RECOMMENDED SAVINGS* $96,448 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Water Usage Electricity Usage Water Usage
$ kWh $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,533
Cost:
$4,129
$12,533 189,895 - - $12,533
189,895
kWh
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,018
Cost:
$7,359
$3,018 45,731 - - $3,018
45,731
kWh
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$629
Cost:
$387
$629 9,531 - - $629
9,531
kWh
-
-
Tgal
04: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$80,268
Cost:
$2,200
- - $80,268 10,438 -
-
kWh
$80,268
10,438
Tgal
TOTAL RECOMMENDED Savings:
$96,448
Cost:
$14,075
$16,180 245,157 $80,268 10,438 $16,180
245,157
kWh
$80,268
10,438
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
Tgal
Savings
Cost
$ kWh $ Tgal
Electricity Usage Water Usage Electricity Usage Water Usage