IAC logo
IAC Assessment: OK1034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2020
Principal Product Conveying equipment
NAICS 333922 - Conveyor and Conveying Equipment Manufacturing
SIC 3535 - Conveyors And Conveying Equipment
Sales $50,000,000-$100,000,000
# of Employees 274
Plant Area (Sq.Ft.) 200,000
Annual Production 350 Units
Production Hrs. Annual 2,600
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,549 1,825,355 kWh $0.06
Electricity Demand $97,480 6,910 kW-months/year $14.11
Electricity Fees $2,239 - $ -
Natural Gas $39,463 8,397 MMBtu $4.70
TOTAL ENERGY COSTS $241,731
RECOMMENDED SAVINGS* $42,062 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,930
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,909
Cost:
$49,013
$14,182 253,258 $12,727 902 - - $14,182
253,258
kWh
$12,727
902
kW-months/year
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,582
Cost:
$18,054
- - - - $8,582 - -
-
kWh
-
-
kW-months/year
$8,582
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,014
Cost:
$2,340
$2,014 35,961 - - - - $2,014
35,961
kWh
-
-
kW-months/year
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$536
Cost:
$713
$395 7,061 $141 10 - - $395
7,061
kWh
$141
10
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$459
Cost:
$320
$459 8,199 - - - - $459
8,199
kWh
-
-
kW-months/year
-
-
$
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,799
Cost:
-
$1,799 32,123 - - - - $1,799
32,123
kWh
-
-
kW-months/year
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,763
Cost:
$4,560
$1,763 31,488 - - - - $1,763
31,488
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$42,062
Cost:
$75,000
$20,612 368,090 $12,868 912 $8,582 - $20,612
368,090
kWh
$12,868
912
kW-months/year
$8,582
-
$
TOTAL IMPLEMENTED Savings:
$30,930
Cost:
$53,893
$18,203 325,068 $12,727 902 - - $18,203
325,068
kWh
$12,727
902
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees