IAC Assessment: OK1035
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1035
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2020
Principal Product Treated wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $500,000-$1,000,000
# of Employees 37
Plant Area (Sq.Ft.) 193,522
Annual Production 109,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,967 925,488 kWh $0.08
Electricity Demand $23,681 1,986 kW-months/year $11.92
Electricity Fees $1,092 - $ -
Natural Gas $2,041 422 MMBtu $4.84
TOTAL ENERGY COSTS $96,781
RECOMMENDED SAVINGS* $17,047 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,814
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,099
Cost:
$5,247
$6,099 80,669 - - $6,099
80,669
kWh
-
-
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,472
Cost:
$6,388
$3,472 45,920 - - $3,472
45,920
kWh
-
-
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,459
Cost:
$8,757
$2,759 36,498 $700 59 $2,759
36,498
kWh
$700
59
kW-months/year
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,243
Cost:
$4,000
$2,243 29,667 - - $2,243
29,667
kWh
-
-
kW-months/year
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,774
Cost:
-
$1,774 23,468 - - $1,774
23,468
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$17,047
Cost:
$24,392
$16,347 216,222 $700 59 $16,347
216,222
kWh
$700
59
kW-months/year
TOTAL IMPLEMENTED Savings:
$11,814
Cost:
$15,635
$11,814 156,256 - - $11,814
156,256
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand