IAC logo
IAC Assessment: OK1041
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2021
Principal Product Fabricated metal parts
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 130,000
Annual Production 3,645,498 Pounds
Production Hrs. Annual 2,340
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,157 628,928 kWh $0.04
Electricity Demand $51,597 2,495 kW-months/year $20.68
Electricity Fees $1,421 - $ -
Natural Gas $6,408 995 MMBtu $6.44
TOTAL ENERGY COSTS $84,583
RECOMMENDED SAVINGS* $17,250 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,070
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,337
Cost:
$28,697
$4,286 107,157 $10,051 486 $4,286
107,157
kWh
$10,051
486
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,223
Cost:
$1,690
$1,223 30,576 - - $1,223
30,576
kWh
-
-
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$896
Cost:
$1,927
$896 22,388 - - $896
22,388
kWh
-
-
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$180
Cost:
-
$180 4,493 - - $180
4,493
kWh
-
-
kW-months/year
05: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$614
Cost:
$219
$180 4,491 $434 21 $180
4,491
kWh
$434
21
kW-months/year
TOTAL RECOMMENDED Savings:
$17,250
Cost:
$32,533
$6,765 169,105 $10,485 507 $6,765
169,105
kWh
$10,485
507
kW-months/year
TOTAL IMPLEMENTED Savings:
$17,070
Cost:
$32,533
$6,585 164,612 $10,485 507 $6,585
164,612
kWh
$10,485
507
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand