IAC logo
IAC Assessment: OK1044
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1044
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2021
Principal Product Bottled and Canned Soft Drinks
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 324
Plant Area (Sq.Ft.) 495,245
Annual Production 51,291 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $569,810 14,245,259 kWh $0.04
Electricity Demand $288,728 27,290 kW-months/year $10.58
Electricity Fees $3,871 - $ -
Natural Gas $427,175 168,844 MMBtu $2.53
TOTAL ENERGY COSTS $1,644,141
RECOMMENDED SAVINGS* $29,584 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,702
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,137
Cost:
-
$3,137 78,420 - - - - $3,137
78,420
kWh
-
-
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,516
Cost:
$3,266
$8,516 212,887 - - - - $8,516
212,887
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,702
Cost:
$14,800
$10,792 269,808 $3,910 370 - - $10,792
269,808
kWh
$3,910
370
kW-months/year
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,229
Cost:
$11,200
- - - - $3,229 - -
-
kWh
-
-
kW-months/year
$3,229
-
$
TOTAL RECOMMENDED Savings:
$29,584
Cost:
$29,266
$22,445 561,115 $3,910 370 $3,229 - $22,445
561,115
kWh
$3,910
370
kW-months/year
$3,229
-
$
TOTAL IMPLEMENTED Savings:
$14,702
Cost:
$14,800
$10,792 269,808 $3,910 370 - - $10,792
269,808
kWh
$3,910
370
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees