Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2021 |
Principal Product | Cleaning, Polishing, & Sanitation Preparations |
NAICS | 325612 - Polish and Other Sanitation Good Manufacturing |
SIC | 2842 - Polishes And Sanitation Goods |
Sales | $50,000,000-$100,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 290,000 |
Annual Production | 20,000 Thousand Gallons |
Production Hrs. Annual | 3,744 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $112,421 | 3,038,400 | kWh | $0.04 |
Electricity Demand | $51,809 | 8,722 | kW-months/year | $5.94 |
Natural Gas | $30,545 | 8,727 | MMBtu | $3.50 |
LPG | $29,078 | 1,899 | MMBtu | $15.31 |
TOTAL ENERGY COSTS | $223,853 | |||
RECOMMENDED SAVINGS* | $21,844 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,854 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,296 Cost: $2,422 |
- | - | - | - | - | - | $2,296 | 656 |
- - kWh |
- - kW-months/year |
- - $ |
$2,296 656 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $827 Cost: - |
$827 | 22,344 | - | - | - | - | - | - |
$827 22,344 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $569 Cost: $512 |
$569 | 15,375 | - | - | - | - | - | - |
$569 15,375 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $2,125 Cost: $8,240 |
- | - | - | - | $2,125 | - | - | - |
- - kWh |
- - kW-months/year |
$2,125 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $16,027 Cost: $38,688 |
$10,581 | 285,982 | $5,446 | 917 | - | - | - | - |
$10,581 285,982 kWh |
$5,446 917 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $21,844 Cost: $49,862 |
$11,977 | 323,701 | $5,446 | 917 | $2,125 | - | $2,296 | 656 | $11,977 323,701 kWh |
$5,446 917 kW-months/year |
$2,125 - $ |
$2,296 656 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,854 Cost: $38,688 |
$11,408 | 308,326 | $5,446 | 917 | - | - | - | - | $11,408 308,326 kWh |
$5,446 917 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |