IAC logo
IAC Assessment: OK1048
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1048
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2021
Principal Product Synthetic petroleum based polymers
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2999 - Petroleum And Coal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 95
Plant Area (Sq.Ft.) 190,000
Annual Production 25,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $662,185 13,243,690 kWh $0.05
Electricity Demand $182,885 25,507 kW-months/year $7.17
Natural Gas $987,834 371,366 MMBtu $2.66
TOTAL ENERGY COSTS $1,832,904
RECOMMENDED SAVINGS* $71,220 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,773
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$37,041
Cost:
$2,860
- - - - - - $37,041 13,925 -
-
kWh
-
-
kW-months/year
-
-
$
$37,041
13,925
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,475
Cost:
$13,356
$8,475 169,494 - - - - - - $8,475
169,494
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,257
Cost:
$3,150
$1,500 29,994 $757 106 - - - - $1,500
29,994
kWh
$757
106
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,153
Cost:
$4,000
$1,153 23,058 - - - - - - $1,153
23,058
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$22,294
Cost:
$15,000
- - - - $22,294 - - - -
-
kWh
-
-
kW-months/year
$22,294
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$71,220
Cost:
$38,366
$11,128 222,546 $757 106 $22,294 - $37,041 13,925 $11,128
222,546
kWh
$757
106
kW-months/year
$22,294
-
$
$37,041
13,925
MMBtu
TOTAL IMPLEMENTED Savings:
$47,773
Cost:
$19,366
$9,975 199,488 $757 106 - - $37,041 13,925 $9,975
199,488
kWh
$757
106
kW-months/year
-
-
$
$37,041
13,925
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas