IAC logo
IAC Assessment: OK1052
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1052
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2021
Principal Product heat exchangers
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 150,000
Annual Production 10,000 Tons
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $151,649 2,135,900 kWh $0.07
Electricity Fees $3,512 - $ -
Natural Gas $8,025 7,295 MMBtu $1.10
TOTAL ENERGY COSTS $163,186
RECOMMENDED SAVINGS* $16,202 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,648
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,512
Cost:
$6,000
- - $1,512 - - - -
-
kWh
$1,512
-
$
-
-
MMBtu
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,517
Cost:
$19,500
- - - - $4,517 4,107 -
-
kWh
-
-
$
$4,517
4,107
MMBtu
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,322
Cost:
-
$1,322 18,620 - - - - $1,322
18,620
kWh
-
-
$
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,648
Cost:
$13,284
$6,648 93,638 - - - - $6,648
93,638
kWh
-
-
$
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,203
Cost:
$586
$2,203 31,033 - - - - $2,203
31,033
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$16,202
Cost:
$39,370
$10,173 143,291 $1,512 - $4,517 4,107 $10,173
143,291
kWh
$1,512
-
$
$4,517
4,107
MMBtu
TOTAL IMPLEMENTED Savings:
$6,648
Cost:
$13,284
$6,648 93,638 - - - - $6,648
93,638
kWh
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas