IAC logo
IAC Assessment: OK1053
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1053
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2021
Principal Product Jet engine airfoils
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 174
Plant Area (Sq.Ft.) 97,350
Annual Production 65,333 Pieces
Production Hrs. Annual 7,200
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $575,792 7,197,401 kWh $0.08
Electricity Demand $261,266 57,045 kW-months/year $4.58
Natural Gas $7,196 1,135 MMBtu $6.34
TOTAL ENERGY COSTS $850,808
RECOMMENDED SAVINGS* $43,411 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,792
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,834
Cost:
$16,500
- - - - $11,834 - -
-
kWh
-
-
kW-months/year
$11,834
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,462
Cost:
$16,440
$18,462 230,775 - - - - $18,462
230,775
kWh
-
-
kW-months/year
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,980
Cost:
-
$3,980 49,752 - - - - $3,980
49,752
kWh
-
-
kW-months/year
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,785
Cost:
$1,966
$1,630 20,376 $155 34 - - $1,630
20,376
kWh
$155
34
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,155
Cost:
$26,670
$5,720 71,503 $435 95 - - $5,720
71,503
kWh
$435
95
kW-months/year
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,195
Cost:
$3,190
$1,195 14,936 - - - - $1,195
14,936
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$43,411
Cost:
$64,766
$30,987 387,342 $590 129 $11,834 - $30,987
387,342
kWh
$590
129
kW-months/year
$11,834
-
$
TOTAL IMPLEMENTED Savings:
$29,792
Cost:
$46,300
$29,357 366,966 $435 95 - - $29,357
366,966
kWh
$435
95
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees