IAC logo
IAC Assessment: OK1067
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1067
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2022
Principal Product Recreational boats
NAICS 336612 - Boat Building
SIC 3732 - Boat Building And Repairing
Sales $50,000,000-$100,000,000
# of Employees 321
Plant Area (Sq.Ft.) 227,684
Annual Production 2,880 Units
Production Hrs. Annual 2,475
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $351,148 4,389,350 kWh $0.08
Electricity Demand $90,143 15,150 kW-months/year $5.95
Natural Gas $147,453 27,006 MMBtu $5.46
TOTAL ENERGY COSTS $595,020
RECOMMENDED SAVINGS* $49,624 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,143
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,333
Cost:
$81,525
$18,621 232,764 $6,712 1,128 - - $18,621
232,764
kWh
$6,712
1,128
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,849
Cost:
$11,877
$4,849 60,614 - - - - $4,849
60,614
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,225
Cost:
$2,550
$4,225 52,818 - - - - $4,225
52,818
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,861
Cost:
-
$1,861 23,264 - - - - $1,861
23,264
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$1,256
Cost:
$3,146
- - - - $1,256 230 -
-
kWh
-
-
kW-months/year
$1,256
230
MMBtu
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$12,100
Cost:
-
$4,568 57,096 - - $7,532 1,380 $4,568
57,096
kWh
-
-
kW-months/year
$7,532
1,380
MMBtu
TOTAL RECOMMENDED Savings:
$49,624
Cost:
$99,098
$34,124 426,556 $6,712 1,128 $8,788 1,610 $34,124
426,556
kWh
$6,712
1,128
kW-months/year
$8,788
1,610
MMBtu
TOTAL IMPLEMENTED Savings:
$44,143
Cost:
$93,402
$29,899 373,738 $6,712 1,128 $7,532 1,380 $29,899
373,738
kWh
$6,712
1,128
kW-months/year
$7,532
1,380
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas