Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2022 |
Principal Product | Oil & gas field equipment |
NAICS | 333132 - Oil and Gas Field Machinery and Equipment Manufacturing |
SIC | 3533 - Oil And Gas Field Machinery |
Sales | $50,000,000-$100,000,000 |
# of Employees | 499 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 387,000 Pounds |
Production Hrs. Annual | 5,200 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $572,270 | 13,308,605 | kWh | $0.04 |
Electricity Demand | $985,076 | 74,797 | kW-months/year | $13.17 |
Electricity Fees | $163,887 | - | $ | - |
Natural Gas | $51,557 | 9,934 | MMBtu | $5.19 |
TOTAL ENERGY COSTS | $1,772,790 | |||
RECOMMENDED SAVINGS* | $16,513 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,122 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,103 Cost: - |
$3,103 | 72,153 | - | - | - | - |
$3,103 72,153 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,141 Cost: $1,208 |
$2,141 | 49,795 | - | - | - | - |
$2,141 49,795 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $5,553 Cost: $3,192 |
- | - | - | - | $5,553 | 1,070 |
- - kWh |
- - kW-months/year |
$5,553 1,070 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $3,561 Cost: $18,463 |
$2,165 | 50,358 | $1,396 | 106 | - | - |
$2,165 50,358 kWh |
$1,396 106 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $830 Cost: - |
- | - | - | - | $830 | 160 |
- - kWh |
- - kW-months/year |
$830 160 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,325 Cost: $5,412 |
$551 | 12,823 | $774 | 59 | - | - |
$551 12,823 kWh |
$774 59 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $16,513 Cost: $28,275 |
$7,960 | 185,129 | $2,170 | 165 | $6,383 | 1,230 | $7,960 185,129 kWh |
$2,170 165 kW-months/year |
$6,383 1,230 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,122 Cost: $9,812 |
$5,795 | 134,771 | $774 | 59 | $5,553 | 1,070 | $5,795 134,771 kWh |
$774 59 kW-months/year |
$5,553 1,070 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |