IAC Assessment: OK1069
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1069
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2022
Principal Product Awards & Recognition Products
NAICS 339999 - All Other Miscellaneous Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $50,000,000-$100,000,000
# of Employees 320
Plant Area (Sq.Ft.) 221,000
Annual Production 245,336 Units
Production Hrs. Annual 2,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,920 1,699,244 kWh $0.08
Electricity Demand $23,255 2,031 kW-months/year $11.45
Natural Gas $11,140 2,778 MMBtu $4.01
TOTAL ENERGY COSTS $173,198
RECOMMENDED SAVINGS* $14,433 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,433
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,392
Cost:
$27,027
$4,685 59,005 $2,707 236 $4,685
59,005
kWh
$2,707
236
kW-months/year
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,879
Cost:
-
$1,879 23,663 - - $1,879
23,663
kWh
-
-
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$612
Cost:
$304
$612 7,706 - - $612
7,706
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$156
Cost:
$488
$156 1,966 - - $156
1,966
kWh
-
-
kW-months/year
05: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$4,394
Cost:
$1,540
$4,394 55,342 - - $4,394
55,342
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$14,433
Cost:
$29,359
$11,726 147,682 $2,707 236 $11,726
147,682
kWh
$2,707
236
kW-months/year
TOTAL IMPLEMENTED Savings:
$14,433
Cost:
$29,359
$11,726 147,682 $2,707 236 $11,726
147,682
kWh
$2,707
236
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand