IAC Assessment: OK1069
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: OK1069
IAC Center Oklahoma State University
Assessment Year 2022
Principal Product Awards & Recognition Products
NAICS 339999 - All Other Miscellaneous Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $50,000,000-$100,000,000
# of Employees 320
Plant Area (Sq.Ft.) 221,000
Annual Production 245,336 Units
Production Hrs. Annual 2,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,920 1,699,244 kWh $0.08
Electricity Demand $23,255 2,031 kW-months/year $11.45
Natural Gas $11,140 2,778 MMBtu $4.01
TOTAL ENERGY COSTS $173,198
RECOMMENDED SAVINGS* $14,433 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,392
Cost:
$27,027
$4,685 59,005 $2,707 236 $4,685
59,005
kWh
$2,707
236
kW-months/year
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,879
Cost:
-
$1,879 23,663 - - $1,879
23,663
kWh
-
-
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$612
Cost:
$304
$612 7,706 - - $612
7,706
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$156
Cost:
$488
$156 1,966 - - $156
1,966
kWh
-
-
kW-months/year
05: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$4,394
Cost:
$1,540
$4,394 55,342 - - $4,394
55,342
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$14,433
Cost:
$29,359
$11,726 147,682 $2,707 236 $11,726
147,682
kWh
$2,707
236
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand