IAC Assessment: OK1070
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1070
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2022
Principal Product Gas turbines
NAICS 333611 - Turbine and Turbine Generator Set Units Manufacturing
SIC 3511 - Turbines And Turbine Generator Sets
Sales $50,000,000-$100,000,000
# of Employees 130
Plant Area (Sq.Ft.) 110,000
Annual Production 2,500 Units
Production Hrs. Annual 6,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $242,866 4,047,774 kWh $0.06
Natural Gas $10,874 2,025 MMBtu $5.37
LPG $8,465 215 MMBtu $39.37
TOTAL ENERGY COSTS $263,765
RECOMMENDED SAVINGS* $26,721 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,002
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ $ $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,809
Cost:
$9,600
- - $2,809 - - - - - -
-
kWh
$2,809
-
$
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,329
Cost:
-
$1,329 22,156 - - - - - - $1,329
22,156
kWh
-
-
$
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,014
Cost:
$990
$4,014 66,903 - - - - - - $4,014
66,903
kWh
-
-
$
-
-
MMBtu
-
-
$
04: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$3,689
Cost:
$3,294
- - - - $3,689 687 - - -
-
kWh
-
-
$
$3,689
687
MMBtu
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,659
Cost:
$8,954
$2,659 44,312 - - - - - - $2,659
44,312
kWh
-
-
$
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,927
Cost:
$3,985
$2,927 48,788 - - - - - - $2,927
48,788
kWh
-
-
$
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,761
Cost:
$4,884
$6,761 112,684 - - - - - - $6,761
112,684
kWh
-
-
$
-
-
MMBtu
-
-
$
08: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$2,533
Cost:
$440
- - - - - - $2,533 - -
-
kWh
-
-
$
-
-
MMBtu
$2,533
-
$
TOTAL RECOMMENDED Savings:
$26,721
Cost:
$32,147
$17,690 294,843 $2,809 - $3,689 687 $2,533 - $17,690
294,843
kWh
$2,809
-
$
$3,689
687
MMBtu
$2,533
-
$
TOTAL IMPLEMENTED Savings:
$8,002
Cost:
$9,944
$8,002 133,371 - - - - - - $8,002
133,371
kWh
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $
Electricity Usage Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Fees Natural Gas One-time Revenue or Avoided Cost