IAC logo
IAC Assessment: OK1073
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1073
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2022
Principal Product Rubber belts for agricultural machinery
NAICS 333613 - Mechanical Power Transmission Equipment Manufacturing
SIC 3568 - Power Transmission Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 210
Plant Area (Sq.Ft.) 120,000
Annual Production 8,282,486 Pounds
Production Hrs. Annual 7,488
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $238,167 4,763,332 kWh $0.05
Electricity Demand $255,010 11,806 kW-months/year $21.60
Electricity Fees $2,964 - $ -
Natural Gas $457,887 167,724 MMBtu $2.73
TOTAL ENERGY COSTS $954,028
RECOMMENDED SAVINGS* $63,316 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,997
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$32,771
Cost:
$39,489
- - - - $32,771 - -
-
kWh
-
-
kW-months/year
$32,771
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,548
Cost:
$12,334
$10,548 210,961 - - - - $10,548
210,961
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,161
Cost:
$9,927
$9,567 191,338 $5,594 259 - - $9,567
191,338
kWh
$5,594
259
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,707
Cost:
$1,176
$3,707 74,131 - - - - $3,707
74,131
kWh
-
-
kW-months/year
-
-
$
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,129
Cost:
-
$1,129 22,576 - - - - $1,129
22,576
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$63,316
Cost:
$62,926
$24,951 499,006 $5,594 259 $32,771 - $24,951
499,006
kWh
$5,594
259
kW-months/year
$32,771
-
$
TOTAL IMPLEMENTED Savings:
$19,997
Cost:
$11,103
$14,403 288,045 $5,594 259 - - $14,403
288,045
kWh
$5,594
259
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees