IAC logo
IAC Assessment: OK1079
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1079
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2023
Principal Product Aircraft simulator modules and software
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 80
Plant Area (Sq.Ft.) 82,000
Annual Production 110 Units
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,694 1,079,040 kWh $0.11
Natural Gas $16,378 1,601 MMBtu $10.23
TOTAL ENERGY COSTS $140,120
RECOMMENDED SAVINGS* $15,706 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,706
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$800
Cost:
$3,624
$800 7,276 - - - - $800
7,276
kWh
-
-
$
-
-
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$7,184
Cost:
-
$1,844 16,752 - - $5,340 522 $1,844
16,752
kWh
-
-
$
$5,340
522
MMBtu
03: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$5,711
Cost:
$3,994
$5,711 51,917 - - - - $5,711
51,917
kWh
-
-
$
-
-
MMBtu
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$763
Cost:
$10,500
$763 6,936 - - - - $763
6,936
kWh
-
-
$
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$824
Cost:
$3,200
- - $824 - - - -
-
kWh
$824
-
$
-
-
MMBtu
06: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$424
Cost:
$318
$230 2,093 - - $194 19 $230
2,093
kWh
-
-
$
$194
19
MMBtu
TOTAL RECOMMENDED Savings:
$15,706
Cost:
$21,636
$9,348 84,974 $824 - $5,534 541 $9,348
84,974
kWh
$824
-
$
$5,534
541
MMBtu
TOTAL IMPLEMENTED Savings:
$15,706
Cost:
$21,636
$9,348 84,974 $824 - $5,534 541 $9,348
84,974
kWh
$824
-
$
$5,534
541
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas