IAC logo
IAC Assessment: OK1083
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1083
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2023
Principal Product Aircraft assemblies
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 490
Plant Area (Sq.Ft.) 352,000
Annual Production 684 Units
Production Hrs. Annual 5,880
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,169,955 21,271,900 kWh $0.06
Electricity Demand $344,113 54,795 kW-months/year $6.28
Natural Gas $173,530 53,230 MMBtu $3.26
TOTAL ENERGY COSTS $1,753,292
RECOMMENDED SAVINGS* $497,056 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $955
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,764
Cost:
$522
- - - - $1,764 541 -
-
kWh
-
-
kW-months/year
$1,764
541
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,133
Cost:
$12,880
- - - - $3,133 961 -
-
kWh
-
-
kW-months/year
$3,133
961
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$29
Cost:
$123
$29 521 - - - - $29
521
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$491,204
Cost:
$4,927,139
$491,204 8,930,973 - - - - $491,204
8,930,973
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$926
Cost:
$2,799
$753 13,689 $173 28 - - $753
13,689
kWh
$173
28
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$497,056
Cost:
$4,943,463
$491,986 8,945,183 $173 28 $4,897 1,502 $491,986
8,945,183
kWh
$173
28
kW-months/year
$4,897
1,502
MMBtu
TOTAL IMPLEMENTED Savings:
$955
Cost:
$2,922
$782 14,210 $173 28 - - $782
14,210
kWh
$173
28
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas