Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2023
Principal Product Aircraft Refurbishment & Parts Manufacturing
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 132
Plant Area (Sq.Ft.) 98,000
Annual Production 600 Tons
Production Hrs. Annual 7,696
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $299,937 5,998,732 kWh $0.05
Electricity Demand $315,973 14,382 kW-months/year $21.97
Electricity Fees $21,914 - $ -
Natural Gas $58,838 6,348 MMBtu $9.27
TOTAL ENERGY COSTS $764,258
RECOMMENDED SAVINGS* $113,561 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,911
Cost:
$3,927
- - - - $3,911 - - - -
-
kWh
-
-
kW-months/year
$3,911
-
$
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$19,066
Cost:
-
- - - - - - $19,066 - -
-
kWh
-
-
kW-months/year
-
-
$
$19,066
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$32,898
Cost:
$25,297
$21,254 425,074 $11,644 530 - - - - $21,254
425,074
kWh
$11,644
530
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,763
Cost:
$3,150
$1,763 35,259 - - - - - - $1,763
35,259
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$15,967
Cost:
$218,400
$15,242 304,830 $725 33 - - - - $15,242
304,830
kWh
$725
33
kW-months/year
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,555
Cost:
$1,225
$4,555 91,104 - - - - - - $4,555
91,104
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,964
Cost:
$446
$1,844 36,880 $1,120 51 - - - - $1,844
36,880
kWh
$1,120
51
kW-months/year
-
-
$
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,914
Cost:
-
$4,914 98,287 - - - - - - $4,914
98,287
kWh
-
-
kW-months/year
-
-
$
-
-
$
09: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$6,600
Cost:
$14,300
$6,600 132,000 - - - - - - $6,600
132,000
kWh
-
-
kW-months/year
-
-
$
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,923
Cost:
$16,543
$20,923 418,464 - - - - - - $20,923
418,464
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$113,561
Cost:
$283,288
$77,095 1,541,898 $13,489 614 $3,911 - $19,066 - $77,095
1,541,898
kWh
$13,489
614
kW-months/year
$3,911
-
$
$19,066
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes