IAC logo
IAC Assessment: OK1096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2023
Principal Product Flat glass
NAICS 327211 - Flat Glass Manufacturing
SIC 3211 - Flat Glass
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 1,700,000
Annual Production 511,000 Tons
Production Hrs. Annual 8,736
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $10,528,859 222,049,000 kWh $0.05
Electricity Demand $1,335,067 330,000 kW-months/year $4.05
Natural Gas $18,238,236 2,703,559 MMBtu $6.75
TOTAL ENERGY COSTS $30,438,666
RECOMMENDED SAVINGS* $707,306 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $533,724
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$96,791
Cost:
$464,597
$86,545 1,841,374 $10,246 2,530 - - - - $86,545
1,841,374
kWh
$10,246
2,530
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$38,865
Cost:
$10,337
$38,865 826,915 - - - - - - $38,865
826,915
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$14,151
Cost:
-
$14,151 301,088 - - - - - - $14,151
301,088
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$593
Cost:
$1,354
$530 11,269 $63 16 - - - - $530
11,269
kWh
$63
16
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$11,239
Cost:
-
- - - - $11,239 1,665 - - -
-
kWh
-
-
kW-months/year
$11,239
1,665
MMBtu
-
-
Tgal
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$148,192
Cost:
$1,704,000
$148,192 3,153,023 - - - - - - $148,192
3,153,023
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.1134 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES Savings:
$394,679
Cost:
$75,000
- - - - $394,679 58,471 - - -
-
kWh
-
-
kW-months/year
$394,679
58,471
MMBtu
-
-
Tgal
08: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$2,796
Cost:
$500
- - - - - - $2,796 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,796
-
Tgal
TOTAL RECOMMENDED Savings:
$707,306
Cost:
$2,255,788
$288,283 6,133,669 $10,309 2,546 $405,918 60,136 $2,796 - $288,283
6,133,669
kWh
$10,309
2,546
kW-months/year
$405,918
60,136
MMBtu
$2,796
-
Tgal
TOTAL IMPLEMENTED Savings:
$533,724
Cost:
$551,788
$125,940 2,679,558 $10,309 2,546 $394,679 58,471 $2,796 - $125,940
2,679,558
kWh
$10,309
2,546
kW-months/year
$394,679
58,471
MMBtu
$2,796
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption