Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2024
Principal Product Medical Services
NAICS 622110 - General Medical and Surgical Hospitals
SIC 8062 - General Medical & Surgical Hospitals
Sales $50,000,000-$100,000,000
# of Employees 230
Plant Area (Sq.Ft.) 70,000
Annual Production 500 Pieces
Production Hrs. Annual 8,736
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $322,976 4,378,920 kWh $0.07
Electricity Demand $67,675 9,337 kW-months/year $7.25
Natural Gas $142,116 33,449 MMBtu $4.25
TOTAL ENERGY COSTS $539,146
RECOMMENDED SAVINGS* $120,160 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$52,945
Cost:
$56,850
$46,652 630,429 $6,293 868 - - $46,652
630,429
kWh
$6,293
868
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,264
Cost:
$1,330
$3,264 44,103 - - - - $3,264
44,103
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,873
Cost:
$7,892
- - $5,873 810 - - -
-
kWh
$5,873
810
kW-months/year
-
-
MMBtu
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$30,588
Cost:
$280,800
$30,588 413,357 - - - - $30,588
413,357
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$8,594
Cost:
$22,000
- - - - $8,594 2,022 -
-
kWh
-
-
kW-months/year
$8,594
2,022
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$15,219
Cost:
$12,400
- - - - $15,219 3,581 -
-
kWh
-
-
kW-months/year
$15,219
3,581
MMBtu
07: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$2,681
Cost:
$1,861
- - - - $2,681 631 -
-
kWh
-
-
kW-months/year
$2,681
631
MMBtu
08: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$996
Cost:
$160
$996 13,455 - - - - $996
13,455
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$120,160
Cost:
$383,293
$81,500 1,101,344 $12,166 1,678 $26,494 6,234 $81,500
1,101,344
kWh
$12,166
1,678
kW-months/year
$26,494
6,234
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas