IAC Assessment: OK1111
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1111
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2024
Principal Product Aerospace components
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 158
Plant Area (Sq.Ft.) 715,000
Annual Production 5,000 Units
Production Hrs. Annual 2,040
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $997,777 12,873,600 kWh $0.08
Electricity Demand $334,977 32,810 kW-months/year $10.21
Natural Gas $102,024 19,323 MMBtu $5.28
TOTAL ENERGY COSTS $1,449,980
RECOMMENDED SAVINGS* $220,659 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$46,469
Cost:
$113,104
$38,591 494,754 $7,878 772 - - $38,591
494,754
kWh
$7,878
772
kW-months/year
-
-
MMBtu
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$129,812
Cost:
$935,220
$129,812 1,664,250 - - - - $129,812
1,664,250
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$31,271
Cost:
$46,928
$31,271 400,908 - - - - $31,271
400,908
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,608
Cost:
$3,599
$3,608 46,255 - - - - $3,608
46,255
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$935
Cost:
$22,000
- - - - $935 177 -
-
kWh
-
-
kW-months/year
$935
177
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$83
Cost:
$83
$83 1,058 - - - - $83
1,058
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$7,982
Cost:
$16,792
$7,982 102,326 - - - - $7,982
102,326
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$499
Cost:
$236
$499 6,390 - - - - $499
6,390
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$220,659
Cost:
$1,137,962
$211,846 2,715,941 $7,878 772 $935 177 $211,846
2,715,941
kWh
$7,878
772
kW-months/year
$935
177
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas