IAC Assessment: OK1122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2024
Principal Product Machined aerospace parts
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $1,000,000-$5,000,000
# of Employees 22
Plant Area (Sq.Ft.) 56,000
Annual Production 10,579 Pieces
Production Hrs. Annual 3,432
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,507 531,331 kWh $0.08
Electricity Demand $21,392 2,203 kW-months/year $9.71
Electricity Fees $9,945 - $ -
Natural Gas $9,614 837 MMBtu $11.49
TOTAL ENERGY COSTS $84,716
RECOMMENDED SAVINGS* $20,619 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$3,216
Cost:
-
- - - - - - $3,216 - -
-
kWh
-
-
kW-months/year
-
-
$
$3,216
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,369
Cost:
$1,999
- - - - $1,369 - - - -
-
kWh
-
-
kW-months/year
$1,369
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,248
Cost:
$6,134
$4,500 56,248 $1,748 180 - - - - $4,500
56,248
kWh
$1,748
180
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,075
Cost:
$1,480
$1,075 13,432 - - - - - - $1,075
13,432
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$2,883
Cost:
$5,538
$2,883 36,036 - - - - - - $2,883
36,036
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,929
Cost:
$600
$2,929 36,617 - - - - - - $2,929
36,617
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$534
Cost:
$403
$456 5,694 $78 8 - - - - $456
5,694
kWh
$78
8
kW-months/year
-
-
$
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$575
Cost:
-
$575 7,183 - - - - - - $575
7,183
kWh
-
-
kW-months/year
-
-
$
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,790
Cost:
$3,368
$1,790 22,374 - - - - - - $1,790
22,374
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$20,619
Cost:
$19,522
$14,208 177,584 $1,826 188 $1,369 - $3,216 - $14,208
177,584
kWh
$1,826
188
kW-months/year
$1,369
-
$
$3,216
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes