IAC logo
IAC Assessment: OK1133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2025
Principal Product Copper Bus bars, Connectors, Terminal Plates
NAICS 335931 - Current-Carrying Wiring Device Manufacturing
SIC 3643 - Current-carrying Wiring Devices
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 65,000
Annual Production 1,772,111 Pieces
Production Hrs. Annual 4,160
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,388 1,012,860 kWh $0.10
Electricity Demand $42,027 4,452 kW-months/year $9.44
Natural Gas $37,486 4,487 MMBtu $8.35
TOTAL ENERGY COSTS $194,040
RECOMMENDED SAVINGS* $51,894 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$878
Cost:
$1,370
$689 7,104 $189 20 - - - - - - $689
7,104
kWh
$189
20
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$23,461
Cost:
$163,800
$23,461 241,864 - - - - - - - - $23,461
241,864
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,711
Cost:
$4,416
- - - - $5,711 - - - - - -
-
kWh
-
-
kW-months/year
$5,711
-
$
-
-
MMBtu
-
-
$
04: 2.8117 INSTALL SUB-METERING EQUIPMENT Savings:
$677
Cost:
$990
- - - - - - - - $677 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$677
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,253
Cost:
$7,180
$10,253 105,700 - - - - - - - - $10,253
105,700
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$10,095
Cost:
$25,179
- - - - - - $10,095 1,209 - - -
-
kWh
-
-
kW-months/year
-
-
$
$10,095
1,209
MMBtu
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$819
Cost:
$480
$819 8,439 - - - - - - - - $819
8,439
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$51,894
Cost:
$203,415
$35,222 363,107 $189 20 $5,711 - $10,095 1,209 $677 - $35,222
363,107
kWh
$189
20
kW-months/year
$5,711
-
$
$10,095
1,209
MMBtu
$677
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes