IAC logo
IAC Assessment: OKO952
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OKO952
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2016
Principal Product SYP Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $50,000,000-$100,000,000
# of Employees 135
Plant Area (Sq.Ft.) 241,500
Annual Production 220 Units
Production Hrs. Annual 4,990
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $786,599 20,764,800 kWh $0.04
Electricity Demand $328,909 44,329 kW-months/year $7.42
TOTAL ENERGY COSTS $1,115,508
RECOMMENDED SAVINGS* $120,451 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,689
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$39,072
Cost:
$32,000
$39,072 1,028,321 - - - - $39,072
1,028,321
kWh
-
-
kW-months/year
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$29,900
Cost:
$37,940
$20,343 535,409 $9,557 1,288 - - $20,343
535,409
kWh
$9,557
1,288
kW-months/year
-
-
$
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$7,312
Cost:
-
$6,990 183,937 $3,282 442 $(-2,960) - $6,990
183,937
kWh
$3,282
442
kW-months/year
$(-2,960)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,021
Cost:
$29,085
$8,216 216,216 $2,805 378 - - $8,216
216,216
kWh
$2,805
378
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,284
Cost:
$6,222
$955 25,122 $329 44 - - $955
25,122
kWh
$329
44
kW-months/year
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$21,399
Cost:
$82,500
- - - - $21,399 - -
-
kWh
-
-
kW-months/year
$21,399
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,312
Cost:
-
$16,762 441,116 - - $(-6,450) - $16,762
441,116
kWh
-
-
kW-months/year
$(-6,450)
-
$
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$151
Cost:
$160
$151 3,973 - - - - $151
3,973
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$120,451
Cost:
$187,907
$92,489 2,434,094 $15,973 2,153 $11,989 - $92,489
2,434,094
kWh
$15,973
2,153
kW-months/year
$11,989
-
$
TOTAL IMPLEMENTED Savings:
$61,689
Cost:
$67,307
$65,005 1,710,775 $3,134 422 $(-6,450) - $65,005
1,710,775
kWh
$3,134
422
kW-months/year
$(-6,450)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees