IAC Assessment: OR0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1987
Principal Product SILICON WAFERS
NAICS n/a
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 325
Plant Area (Sq.Ft.) 0
Annual Production 148 Thousand Feet
Production Hrs. Annual 8,448
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $497,236 17,720,985 kWh $0.03
TOTAL ENERGY COSTS $497,236
RECOMMENDED SAVINGS* $44,132 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,462
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$451
Cost:
-
$333 11,723 $118 - $333
11,723
kWh
$118
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,009
Cost:
$8,000
$1,009 36,049 - - $1,009
36,049
kWh
-
-
$
03: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$8,718
Cost:
$1,000
- - $8,718 - -
-
kWh
$8,718
-
$
04: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$25,130
Cost:
$7,000
- - $25,130 - -
-
kWh
$25,130
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$718
Cost:
$200
$718 25,498 - - $718
25,498
kWh
-
-
$
06: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$1,143
Cost:
$600
$901 31,946 $242 - $901
31,946
kWh
$242
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$874
Cost:
$1,320
$874 31,067 - - $874
31,067
kWh
-
-
$
08: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$6,089
Cost:
$13,772
$6,089 217,175 - - $6,089
217,175
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$44,132
Cost:
$31,892
$9,924 353,458 $34,208 - $9,924
353,458
kWh
$34,208
-
$
TOTAL IMPLEMENTED Savings:
$12,462
Cost:
$11,120
$3,502 124,560 $8,960 - $3,502
124,560
kWh
$8,960
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes