IAC logo
IAC Assessment: OR0007
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0007
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1987
Principal Product METAL CANS
NAICS n/a
SIC 3411 - Metal Cans
Sales $10,000,000-$50,000,000
# of Employees 57
Plant Area (Sq.Ft.) 0
Annual Production 146,600 Pieces
Production Hrs. Annual 4,950
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,690 1,668,523 kWh $0.03
Natural Gas $32,167 6,543 MMBtu $4.92
TOTAL ENERGY COSTS $88,857
RECOMMENDED SAVINGS* $40,081 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,959
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$4,816
Cost:
$20
- - $4,816 979 - - -
-
kWh
$4,816
979
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$345
Cost:
-
$345 10,258 - - - - $345
10,258
kWh
-
-
MMBtu
-
-
$
03: 2.7314 REDUCE VENTILATION AIR Savings:
$4,062
Cost:
$11
$890 26,084 $3,172 645 - - $890
26,084
kWh
$3,172
645
MMBtu
-
-
$
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,646
Cost:
$1,700
$3,646 107,268 - - - - $3,646
107,268
kWh
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$677
Cost:
$168
$677 39,566 - - - - $677
39,566
kWh
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,065
Cost:
$5,550
- - $7,065 1,436 - - -
-
kWh
$7,065
1,436
MMBtu
-
-
$
07: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$8,339
Cost:
$6,586
- - $8,339 1,695 - - -
-
kWh
$8,339
1,695
MMBtu
-
-
$
08: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$4,413
Cost:
$3,346
- - $4,413 897 - - -
-
kWh
$4,413
897
MMBtu
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,736
Cost:
$2,420
$2,736 - - - - - $2,736
-
kWh
-
-
MMBtu
-
-
$
10: 2.7446 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS Savings:
$49
Cost:
$80
$49 1,465 - - - - $49
1,465
kWh
-
-
MMBtu
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,933
Cost:
$8,957
$1,580 46,600 - - $2,353 - $1,580
46,600
kWh
-
-
MMBtu
$2,353
-
$
TOTAL RECOMMENDED Savings:
$40,081
Cost:
$28,838
$9,923 231,241 $27,805 5,652 $2,353 - $9,923
231,241
kWh
$27,805
5,652
MMBtu
$2,353
-
$
TOTAL IMPLEMENTED Savings:
$11,959
Cost:
$2,451
$3,971 36,342 $7,988 1,624 - - $3,971
36,342
kWh
$7,988
1,624
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes