IAC logo
IAC Assessment: OR0009
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0009
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1987
Principal Product LUMBER
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 45,000 Thousand Feet
Production Hrs. Annual 6,300
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $367,654 7,278,136 kWh $0.05
Wood $580,949 984,657 MMBtu $0.59
TOTAL ENERGY COSTS $948,603
RECOMMENDED SAVINGS* $533,122 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,011
#|Description Savings
Cost
Status Electricity Usage Wood Electricity Usage Wood
$ kWh $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,979
Cost:
-
$2,979 58,910 - - $2,979
58,910
kWh
-
-
MMBtu
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$13,372
Cost:
$100
$13,372 262,310 - - $13,372
262,310
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,752
Cost:
$500
$3,752 73,564 - - $3,752
73,564
kWh
-
-
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$23,307
Cost:
$300
- - $23,307 39,503 -
-
kWh
$23,307
39,503
MMBtu
05: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$6,734
Cost:
$1,035
$6,734 132,181 - - $6,734
132,181
kWh
-
-
MMBtu
06: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$6,380
Cost:
$2,300
- - $6,380 10,814 -
-
kWh
$6,380
10,814
MMBtu
07: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$8,914
Cost:
$3,380
- - $8,914 15,108 -
-
kWh
$8,914
15,108
MMBtu
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$208
Cost:
$243
$208 4,103 - - $208
4,103
kWh
-
-
MMBtu
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,465
Cost:
$3,040
$2,465 48,359 - - $2,465
48,359
kWh
-
-
MMBtu
10: 2.5123 REDUCE FLUID FLOW RATES Savings:
$31,011
Cost:
$7,283
$31,011 1,193,142 - - $31,011
1,193,142
kWh
-
-
MMBtu
11: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$434,000
Cost:
$960,000
$455,000 13,403,869 $(-21,000) (-35,000) $455,000
13,403,869
kWh
$(-21,000)
(-35,000)
MMBtu
TOTAL RECOMMENDED Savings:
$533,122
Cost:
$978,181
$515,521 15,176,438 $17,601 30,425 $515,521
15,176,438
kWh
$17,601
30,425
MMBtu
TOTAL IMPLEMENTED Savings:
$31,011
Cost:
$7,283
$31,011 1,193,142 - - $31,011
1,193,142
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Wood Electricity Usage Wood