IAC Assessment: OR0030
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0030
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1988
Principal Product POTATOE & CORN CHIPS
NAICS n/a
SIC 2096 - Potato Chips And Similar Snacks
Sales $100,000,000-$500,000,000
# of Employees 470
Plant Area (Sq.Ft.) 0
Annual Production 58,000,000 Pounds
Production Hrs. Annual 6,864
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $230,603 8,437,866 kWh $0.03
Natural Gas $1,242,039 261,393 MMBtu $4.75
TOTAL ENERGY COSTS $1,472,642
RECOMMENDED SAVINGS* $138,093 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $138,093
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$763
Cost:
-
$763 28,136 - - - - $763
28,136
kWh
-
-
MMBtu
-
-
$
02: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$81,387
Cost:
$25,000
$(-1,063) (-39,273) - - $82,450 - $(-1,063)
(-39,273)
kWh
-
-
MMBtu
$82,450
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$228
Cost:
$150
- - $228 52 - - -
-
kWh
$228
52
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$201
Cost:
$349
$117 4,396 - - $84 - $117
4,396
kWh
-
-
MMBtu
$84
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$851
Cost:
$1,879
$1,169 43,376 - - $(-318) - $1,169
43,376
kWh
-
-
MMBtu
$(-318)
-
$
06: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$50,942
Cost:
$100,000
- - $50,942 11,710 - - -
-
kWh
$50,942
11,710
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,721
Cost:
$21,000
- - $3,721 855 - - -
-
kWh
$3,721
855
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$138,093
Cost:
$148,378
$986 36,635 $54,891 12,617 $82,216 - $986
36,635
kWh
$54,891
12,617
MMBtu
$82,216
-
$
TOTAL IMPLEMENTED Savings:
$138,093
Cost:
$148,378
$986 36,635 $54,891 12,617 $82,216 - $986
36,635
kWh
$54,891
12,617
MMBtu
$82,216
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes