IAC logo
IAC Assessment: OR0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1988
Principal Product PACKAGED SEAFOOD
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 0
Annual Production 12,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,165 2,662,954 kWh $0.03
Fuel Oil #1 $1,503 225 MMBtu $6.68
Fuel Oil #2 $41,262 7,494 MMBtu $5.51
TOTAL ENERGY COSTS $132,930
RECOMMENDED SAVINGS* $5,365 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,928
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2114 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE Savings:
$975
Cost:
$44
- - $975 177 - - -
-
kWh
$975
177
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,437
Cost:
$835
$1,225 36,049 - - $212 - $1,225
36,049
kWh
-
-
MMBtu
$212
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,802
Cost:
$1,200
- - $1,802 327 - - -
-
kWh
$1,802
327
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$227
Cost:
$300
- - $727 132 $(-500) - -
-
kWh
$727
132
MMBtu
$(-500)
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$52
Cost:
$137
$42 1,172 - - $10 - $42
1,172
kWh
-
-
MMBtu
$10
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$872
Cost:
$3,420
- - $872 158 - - -
-
kWh
$872
158
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$5,365
Cost:
$5,936
$1,267 37,221 $4,376 794 $(-278) - $1,267
37,221
kWh
$4,376
794
MMBtu
$(-278)
-
$
TOTAL IMPLEMENTED Savings:
$3,928
Cost:
$5,101
$42 1,172 $4,376 794 $(-490) - $42
1,172
kWh
$4,376
794
MMBtu
$(-490)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes