IAC logo
IAC Assessment: OR0039
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0039
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1988
Principal Product DIMENSIONAL LUMBER
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 0
Annual Production 76,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $324,450 6,935,522 kWh $0.05
Wood $222,254 520,715 MMBtu $0.43
TOTAL ENERGY COSTS $546,704
RECOMMENDED SAVINGS* $108,362 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,362
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,384
Cost:
$5,000
$13,384 286,049 - - - - $13,384
286,049
kWh
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$498
Cost:
$630
$498 10,551 - - - - $498
10,551
kWh
-
-
MMBtu
-
-
$
03: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$73,000
Cost:
$100,000
$353,000 6,935,522 $(-133,000) (-309,302) $(-147,000) - $353,000
6,935,522
kWh
$(-133,000)
(-309,302)
MMBtu
$(-147,000)
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,379
Cost:
$13,650
$6,379 - - - - - $6,379
-
kWh
-
-
MMBtu
-
-
$
05: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$15,101
Cost:
$32,576
$15,101 442,849 - - - - $15,101
442,849
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$108,362
Cost:
$151,856
$388,362 7,674,971 $(-133,000) (-309,302) $(-147,000) - $388,362
7,674,971
kWh
$(-133,000)
(-309,302)
MMBtu
$(-147,000)
-
$
TOTAL IMPLEMENTED Savings:
$35,362
Cost:
$51,856
$35,362 739,449 - - - - $35,362
739,449
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes