IAC Assessment: OR0070
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0070
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1989
Principal Product DEHYDRATED FOOD
NAICS n/a
SIC 2034 - Dehydrated Fruits, Vegetables, Soups
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 3,900,000 Pounds
Production Hrs. Annual 8,064
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $298,319 7,283,119 kWh $0.04
Natural Gas $86,224 23,541 MMBtu $3.66
TOTAL ENERGY COSTS $384,543
RECOMMENDED SAVINGS* $42,830 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,830
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$13,228
Cost:
$2,500
- - $11,331 3,095 $1,897 - -
-
kWh
$11,331
3,095
MMBtu
$1,897
-
$
02: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$12,697
Cost:
$2,400
- - $7,184 1,963 $5,513 - -
-
kWh
$7,184
1,963
MMBtu
$5,513
-
$
03: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$3,909
Cost:
$1,090
- - $3,198 873 $711 - -
-
kWh
$3,198
873
MMBtu
$711
-
$
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$8,766
Cost:
-
$8,766 219,226 - - - - $8,766
219,226
kWh
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,113
Cost:
$1,204
$1,113 27,257 - - - - $1,113
27,257
kWh
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$232
Cost:
$250
$232 5,862 - - - - $232
5,862
kWh
-
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,260
Cost:
$2,000
- - $1,260 344 - - -
-
kWh
$1,260
344
MMBtu
-
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,625
Cost:
$3,450
$1,625 - - - - - $1,625
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$42,830
Cost:
$12,894
$11,736 252,345 $22,973 6,275 $8,121 - $11,736
252,345
kWh
$22,973
6,275
MMBtu
$8,121
-
$
TOTAL IMPLEMENTED Savings:
$42,830
Cost:
$12,894
$11,736 252,345 $22,973 6,275 $8,121 - $11,736
252,345
kWh
$22,973
6,275
MMBtu
$8,121
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes