IAC Assessment: OR0078
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0078
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1990
Principal Product DIMENSIONAL LUMBER
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $50,000,000-$100,000,000
# of Employees 70
Plant Area (Sq.Ft.) 0
Annual Production 220,000 Thousand Feet
Production Hrs. Annual 4,008
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $661,731 14,054,514 kWh $0.05
TOTAL ENERGY COSTS $661,731
RECOMMENDED SAVINGS* $65,737 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,128
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$16,426
Cost:
-
$16,426 414,127 - - $16,426
414,127
kWh
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$457
Cost:
-
$457 12,309 - - $457
12,309
kWh
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,401
Cost:
-
$8,401 178,781 - - $8,401
178,781
kWh
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,404
Cost:
$5,000
$14,404 306,565 - - $14,404
306,565
kWh
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$12,298
Cost:
$1,600
$9,467 256,155 $2,831 - $9,467
256,155
kWh
$2,831
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,674
Cost:
$938
$9,674 205,451 - - $9,674
205,451
kWh
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,077
Cost:
-
$4,077 - - - $4,077
-
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$65,737
Cost:
$7,538
$62,906 1,373,388 $2,831 - $62,906
1,373,388
kWh
$2,831
-
$
TOTAL IMPLEMENTED Savings:
$43,128
Cost:
$6,600
$40,297 976,847 $2,831 - $40,297
976,847
kWh
$2,831
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes