IAC logo
IAC Assessment: OR0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1990
Principal Product PLASTIC CONTAINERS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 11,000,000 Pounds
Production Hrs. Annual 7,008
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $524,930 11,477,140 kWh $0.05
Natural Gas $24,512 4,684 MMBtu $5.23
TOTAL ENERGY COSTS $549,442
RECOMMENDED SAVINGS* $17,903 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,291
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$604
Cost:
$278
$604 16,413 - - $604
16,413
kWh
-
-
$
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$461
Cost:
$592
$370 9,965 $91 - $370
9,965
kWh
$91
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,603
Cost:
$2,563
$1,603 33,998 - - $1,603
33,998
kWh
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,837
Cost:
$3,500
$1,837 49,824 - - $1,837
49,824
kWh
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$9,851
Cost:
$18,000
$9,851 - - - $9,851
-
kWh
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,547
Cost:
$9,000
$3,547 - - - $3,547
-
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$17,903
Cost:
$33,933
$17,812 110,200 $91 - $17,812
110,200
kWh
$91
-
$
TOTAL IMPLEMENTED Savings:
$13,291
Cost:
$24,063
$13,291 83,822 - - $13,291
83,822
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes