IAC logo
IAC Assessment: OR0090
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0090
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1990
Principal Product PLASTIC PIPE
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 23,900,000 Pounds
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $252,342 5,463,951 kWh $0.05
TOTAL ENERGY COSTS $252,342
RECOMMENDED SAVINGS* $75,141 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,125
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$64,713
Cost:
$5,000
$(-11,937) (-264,654) $76,650 - $(-11,937)
(-264,654)
kWh
$76,650
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$412
Cost:
$509
$412 9,086 - - $412
9,086
kWh
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,562
Cost:
$3,277
$1,562 41,032 - - $1,562
41,032
kWh
-
-
$
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$1,098
Cost:
$2,400
$1,098 28,722 - - $1,098
28,722
kWh
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$687
Cost:
$1,950
$687 - - - $687
-
kWh
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$6,669
Cost:
$22,569
$7,769 - $(-1,100) - $7,769
-
kWh
$(-1,100)
-
$
TOTAL RECOMMENDED Savings:
$75,141
Cost:
$35,705
$(-409) (-185,814) $75,550 - $(-409)
(-185,814)
kWh
$75,550
-
$
TOTAL IMPLEMENTED Savings:
$65,125
Cost:
$5,509
$(-11,525) (-255,568) $76,650 - $(-11,525)
(-255,568)
kWh
$76,650
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes