IAC logo
IAC Assessment: OR0097
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1990
Principal Product CHARCOAL BRIQUETS
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 0
Annual Production 70,000 Tons
Production Hrs. Annual 8,064
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $233,049 8,978,019 kWh $0.03
Natural Gas $123,896 32,207 MMBtu $3.85
TOTAL ENERGY COSTS $356,945
RECOMMENDED SAVINGS* $27,764 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,815
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,683
Cost:
$500
- - $5,683 1,476 -
-
kWh
$5,683
1,476
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,133
Cost:
$4,200
$9,133 387,163 - - $9,133
387,163
kWh
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,999
Cost:
$5,100
$4,999 - - - $4,999
-
kWh
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$345
Cost:
$693
$345 14,068 - - $345
14,068
kWh
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,093
Cost:
$4,370
- - $1,093 284 -
-
kWh
$1,093
284
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,511
Cost:
$27,350
$6,511 269,930 - - $6,511
269,930
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,764
Cost:
$42,213
$20,988 671,161 $6,776 1,760 $20,988
671,161
kWh
$6,776
1,760
MMBtu
TOTAL IMPLEMENTED Savings:
$19,815
Cost:
$9,800
$14,132 387,163 $5,683 1,476 $14,132
387,163
kWh
$5,683
1,476
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas