IAC logo
IAC Assessment: OR0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1991
Principal Product DIMENSIONAL LUMBER
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $50,000,000-$100,000,000
# of Employees 205
Plant Area (Sq.Ft.) 0
Annual Production 226,000 Thousand Feet
Production Hrs. Annual 4,320
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $886,323 24,202,814 kWh $0.04
Natural Gas $87,474 23,652 MMBtu $3.70
TOTAL ENERGY COSTS $973,797
RECOMMENDED SAVINGS* $60,939 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $60,939
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,459
Cost:
-
$5,459 248,242 - - $5,459
248,242
kWh
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$13,315
Cost:
-
$11,107 504,982 $2,208 - $11,107
504,982
kWh
$2,208
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$30,030
Cost:
$20,000
$30,030 868,113 - - $30,030
868,113
kWh
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,238
Cost:
$2,448
$1,238 31,653 - - $1,238
31,653
kWh
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,897
Cost:
$40,925
$10,897 259,379 - - $10,897
259,379
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$60,939
Cost:
$63,373
$58,731 1,912,369 $2,208 - $58,731
1,912,369
kWh
$2,208
-
$
TOTAL IMPLEMENTED Savings:
$60,939
Cost:
$63,373
$58,731 1,912,369 $2,208 - $58,731
1,912,369
kWh
$2,208
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes