IAC logo
IAC Assessment: OR0107
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0107
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1991
Principal Product ASPHALT ROOFING
NAICS n/a
SIC 2952 - Asphalt Felts And Coatings
Sales $10,000,000-$50,000,000
# of Employees 71
Plant Area (Sq.Ft.) 0
Annual Production 89,000 Tons
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $128,287 2,832,943 kWh $0.05
Natural Gas $116,898 45,354 MMBtu $2.58
TOTAL ENERGY COSTS $245,185
RECOMMENDED SAVINGS* $164,550 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $164,550
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,299
Cost:
-
$1,199 25,498 - - $100 - $1,199
25,498
kWh
-
-
MMBtu
$100
-
$
02: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$123,679
Cost:
-
$1,350 26,084 - - $122,329 - $1,350
26,084
kWh
-
-
MMBtu
$122,329
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,674
Cost:
$10,500
- - $15,674 6,075 - - -
-
kWh
$15,674
6,075
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,622
Cost:
$10,000
$11,622 262,016 - - - - $11,622
262,016
kWh
-
-
MMBtu
-
-
$
05: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$10,621
Cost:
-
$8,848 239,449 - - $1,773 - $8,848
239,449
kWh
-
-
MMBtu
$1,773
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$330
Cost:
$420
$330 7,034 - - - - $330
7,034
kWh
-
-
MMBtu
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$996
Cost:
$2,550
$996 - - - - - $996
-
kWh
-
-
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$329
Cost:
$1,475
$329 6,741 - - - - $329
6,741
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$164,550
Cost:
$24,945
$24,674 566,822 $15,674 6,075 $124,202 - $24,674
566,822
kWh
$15,674
6,075
MMBtu
$124,202
-
$
TOTAL IMPLEMENTED Savings:
$164,550
Cost:
$24,945
$24,674 566,822 $15,674 6,075 $124,202 - $24,674
566,822
kWh
$15,674
6,075
MMBtu
$124,202
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes