Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1991 |
Principal Product | ALES |
NAICS | n/a |
SIC | 2082 - Malt Beverages |
Sales | $500,000-$1,000,000 |
# of Employees | 14 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 126 Thousand Gallons |
Production Hrs. Annual | 4,080 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $6,953 | 128,077 | kWh | $0.05 |
Natural Gas | $5,540 | 1,068 | MMBtu | $5.19 |
TOTAL ENERGY COSTS | $12,493 | |||
RECOMMENDED SAVINGS* | $3,914 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,914 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $102 Cost: $51 |
- | - | $102 | 20 | - | - |
- - kWh |
$102 20 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4157 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING |
Savings: $1,988 Cost: - |
$(-128) | (-2,931) | - | - | $2,116 | - |
$(-128) (-2,931) kWh |
- - MMBtu |
$2,116 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $323 Cost: - |
$124 | 2,931 | - | - | $199 | - |
$124 2,931 kWh |
- - MMBtu |
$199 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4151 MINIMIZE WATER USAGE |
Savings: $370 Cost: - |
- | - | $249 | 48 | $121 | - |
- - kWh |
$249 48 MMBtu |
$121 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $62 Cost: $150 |
$62 | 1,758 | - | - | - | - |
$62 1,758 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $1,069 Cost: $1,500 |
- | - | $1,069 | 206 | - | - |
- - kWh |
$1,069 206 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $3,914 Cost: $1,701 |
$58 | 1,758 | $1,420 | 274 | $2,436 | - | $58 1,758 kWh |
$1,420 274 MMBtu |
$2,436 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,914 Cost: $1,701 |
$58 | 1,758 | $1,420 | 274 | $2,436 | - | $58 1,758 kWh |
$1,420 274 MMBtu |
$2,436 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |