IAC logo
IAC Assessment: OR0114
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0114
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1991
Principal Product HARDWOOD PLYWOOD
NAICS n/a
SIC 2435 - Hardwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 6,000 Thousand Feet
Production Hrs. Annual 4,160
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,599 2,324,150 kWh $0.05
Natural Gas $7,020 1,377 MMBtu $5.10
TOTAL ENERGY COSTS $122,619
RECOMMENDED SAVINGS* $14,396 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,058
Cost:
-
$1,058 20,809 - - - - $1,058
20,809
kWh
-
-
MMBtu
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$486
Cost:
-
$486 7,620 - - - - $486
7,620
kWh
-
-
MMBtu
-
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$60
Cost:
$78
$60 1,172 - - - - $60
1,172
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$181
Cost:
-
$202 4,396 - - $(-21) - $202
4,396
kWh
-
-
MMBtu
$(-21)
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$12,611
Cost:
-
$21,241 319,461 $(-8,630) (-1,712) - - $21,241
319,461
kWh
$(-8,630)
(-1,712)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$14,396
Cost:
$78
$23,047 353,458 $(-8,630) (-1,712) $(-21) - $23,047
353,458
kWh
$(-8,630)
(-1,712)
MMBtu
$(-21)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes