IAC logo
IAC Assessment: OR0133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1991
Principal Product DIMENSIONAL LUMBER
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 25,000 Thousand Feet
Production Hrs. Annual 3,920
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $472,830 7,711,606 kWh $0.06
TOTAL ENERGY COSTS $472,830
RECOMMENDED SAVINGS* $48,969 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,969
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,035
Cost:
-
$868 20,516 $167 - $868
20,516
kWh
$167
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$117
Cost:
-
$117 586 - - $117
586
kWh
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,152
Cost:
$1,000
$4,152 97,597 - - $4,152
97,597
kWh
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$35,000
Cost:
$30,500
$35,000 577,081 - - $35,000
577,081
kWh
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,809
Cost:
$15,000
$6,809 - - - $6,809
-
kWh
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,637
Cost:
$3,882
$1,637 23,740 - - $1,637
23,740
kWh
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$219
Cost:
$850
$219 3,517 - - $219
3,517
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$48,969
Cost:
$51,232
$48,802 723,037 $167 - $48,802
723,037
kWh
$167
-
$
TOTAL IMPLEMENTED Savings:
$48,969
Cost:
$51,232
$48,802 723,037 $167 - $48,802
723,037
kWh
$167
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes