IAC logo
IAC Assessment: OR0149
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0149
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1992
Principal Product ELECTRIC HEATERS
NAICS n/a
SIC 3634 - Electric Housewares And Fans
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 382,600 Pieces
Production Hrs. Annual 6,000
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,234 1,211,313 kWh $0.03
Natural Gas $71,244 17,513 MMBtu $4.07
TOTAL ENERGY COSTS $107,478
RECOMMENDED SAVINGS* $13,517 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,517
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,784
Cost:
-
$1,225 56,272 - - $559 - $1,225
56,272
kWh
-
-
MMBtu
$559
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$214
Cost:
-
$214 7,327 - - - - $214
7,327
kWh
-
-
MMBtu
-
-
$
03: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$7,907
Cost:
$2,071
- - $7,907 1,943 - - -
-
kWh
$7,907
1,943
MMBtu
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$288
Cost:
$200
$288 10,551 - - - - $288
10,551
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,213
Cost:
$1,000
$1,213 44,842 - - - - $1,213
44,842
kWh
-
-
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$182
Cost:
$858
$182 6,741 - - - - $182
6,741
kWh
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,929
Cost:
$3,837
- - $1,929 474 - - -
-
kWh
$1,929
474
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,517
Cost:
$7,966
$3,122 125,733 $9,836 2,417 $559 - $3,122
125,733
kWh
$9,836
2,417
MMBtu
$559
-
$
TOTAL IMPLEMENTED Savings:
$13,517
Cost:
$7,966
$3,122 125,733 $9,836 2,417 $559 - $3,122
125,733
kWh
$9,836
2,417
MMBtu
$559
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes