IAC Assessment: OR0161
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0161
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1992
Principal Product PLANED LUMBER
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 13
Plant Area (Sq.Ft.) 0
Annual Production 53,200 Thousand Feet
Production Hrs. Annual 2,550
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,013 1,297,773 kWh $0.05
TOTAL ENERGY COSTS $60,013
RECOMMENDED SAVINGS* $6,647 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,119
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$384
Cost:
$30
$384 8,206 $384
8,206
kWh
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$289
Cost:
$90
$289 6,155 $289
6,155
kWh
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$183
Cost:
$200
$183 3,810 $183
3,810
kWh
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,535
Cost:
-
$4,535 107,855 $4,535
107,855
kWh
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$911
Cost:
-
$911 27,550 $911
27,550
kWh
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$189
Cost:
-
$189 3,517 $189
3,517
kWh
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$156
Cost:
$1,147
$156 2,931 $156
2,931
kWh
TOTAL RECOMMENDED Savings:
$6,647
Cost:
$1,467
$6,647 160,024 $6,647
160,024
kWh
TOTAL IMPLEMENTED Savings:
$6,119
Cost:
$120
$6,119 149,766 $6,119
149,766
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage