IAC logo
IAC Assessment: OR0163
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0163
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1992
Principal Product Tempered Glass, Insulate
NAICS n/a
SIC 3211 - Flat Glass
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 8,900 Thousand Feet
Production Hrs. Annual 6,240
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $280,912 5,447,831 kWh $0.05
Natural Gas $7,785 1,607 MMBtu $4.84
TOTAL ENERGY COSTS $288,697
RECOMMENDED SAVINGS* $10,472 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,172
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,055
Cost:
-
$3,055 80,012 - - $3,055
80,012
kWh
-
-
$
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$1,832
Cost:
$360
$682 11,723 $1,150 - $682
11,723
kWh
$1,150
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,260
Cost:
$4,000
$4,260 97,890 - - $4,260
97,890
kWh
-
-
$
04: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$676
Cost:
$1,436
$676 14,068 - - $676
14,068
kWh
-
-
$
05: 2.4311 RECOVER MECHANICAL ENERGY Savings:
$300
Cost:
$850
$300 6,741 - - $300
6,741
kWh
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$349
Cost:
-
$375 7,327 $(-26) - $375
7,327
kWh
$(-26)
-
$
TOTAL RECOMMENDED Savings:
$10,472
Cost:
$6,646
$9,348 217,761 $1,124 - $9,348
217,761
kWh
$1,124
-
$
TOTAL IMPLEMENTED Savings:
$10,172
Cost:
$5,796
$9,048 211,020 $1,124 - $9,048
211,020
kWh
$1,124
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes