IAC logo
IAC Assessment: OR0168
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0168
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1993
Principal Product Frozen Pumkin
NAICS n/a
SIC 2037 - Frozen Fruits And Vegetables
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 5,850 Tons
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,603 1,208,382 kWh $0.04
Fuel Oil #2 $23,398 4,752 MMBtu $4.92
Other Energy $15,552 2,258 MMBtu $6.89
TOTAL ENERGY COSTS $85,553
RECOMMENDED SAVINGS* $11,682 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,682
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$2,253
Cost:
-
$2,253 68,288 - - $2,253
68,288
kWh
-
-
MMBtu
02: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$134
Cost:
-
- - $134 27 -
-
kWh
$134
27
MMBtu
03: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$3,366
Cost:
$500
- - $3,366 684 -
-
kWh
$3,366
684
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,200
Cost:
$1,152
$5,200 155,041 - - $5,200
155,041
kWh
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$378
Cost:
$1,008
$378 8,499 - - $378
8,499
kWh
-
-
MMBtu
06: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$351
Cost:
$1,000
- - $351 71 -
-
kWh
$351
71
MMBtu
TOTAL RECOMMENDED Savings:
$11,682
Cost:
$3,660
$7,831 231,828 $3,851 782 $7,831
231,828
kWh
$3,851
782
MMBtu
TOTAL IMPLEMENTED Savings:
$11,682
Cost:
$3,660
$7,831 231,828 $3,851 782 $7,831
231,828
kWh
$3,851
782
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2