IAC Assessment: OR0174
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1993
Principal Product Forklift Accessories
NAICS n/a
SIC 3537 - Industrial Trucks And Tractors
Sales $10,000,000-$50,000,000
# of Employees 198
Plant Area (Sq.Ft.) 0
Annual Production 1,500 Pieces
Production Hrs. Annual 4,160
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,490 1,489,156 kWh $0.03
Natural Gas $7,467 1,496 MMBtu $4.99
Other Energy $52,419 4,146,814 MMBtu $0.01
TOTAL ENERGY COSTS $110,376
RECOMMENDED SAVINGS* $5,924 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,821
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$991
Cost:
$60
$771 27,550 $220 - $771
27,550
kWh
$220
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$185
Cost:
$632
$210 7,620 $(-25) - $210
7,620
kWh
$(-25)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$378
Cost:
$916
$645 25,498 $(-267) - $645
25,498
kWh
$(-267)
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,112
Cost:
$3,750
$3,112 - - - $3,112
-
kWh
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,258
Cost:
$1,000
$1,258 42,204 - - $1,258
42,204
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$5,924
Cost:
$6,358
$5,996 102,872 $(-72) - $5,996
102,872
kWh
$(-72)
-
$
TOTAL IMPLEMENTED Savings:
$1,821
Cost:
$2,548
$2,113 75,322 $(-292) - $2,113
75,322
kWh
$(-292)
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Personnel Changes Electricity Usage Personnel Changes