Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1993 |
Principal Product | Dimensional Lumber |
NAICS | n/a |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $50,000,000-$100,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 67,000 Thousand Feet |
Production Hrs. Annual | 8,736 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $526,062 | 12,853,459 | kWh | $0.04 |
Natural Gas | $375,672 | 101,883 | MMBtu | $3.69 |
TOTAL ENERGY COSTS | $901,734 | |||
RECOMMENDED SAVINGS* | $155,672 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $48,735 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $10,305 Cost: $1,800 |
$10,305 | 314,478 | - | - | - | - |
$10,305 314,478 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,623 Cost: $5,500 |
$5,623 | 146,249 | - | - | - | - |
$5,623 146,249 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
Savings: $75,830 Cost: $146,156 |
$51,348 | 1,566,530 | $24,482 | - | - | - |
$51,348 1,566,530 kWh |
$24,482 - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,468 Cost: $1,287 |
- | - | $1,468 | 398 | - | - |
- - kWh |
$1,468 398 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $29,864 Cost: $32,720 |
$29,864 | 910,903 | - | - | - | - |
$29,864 910,903 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $12,486 Cost: $4,100 |
$10,279 | 251,172 | - | - | $2,207 | - |
$10,279 251,172 kWh |
- - MMBtu |
$2,207 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,372 Cost: - |
$2,372 | 54,220 | - | - | - | - |
$2,372 54,220 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,243 Cost: $3,171 |
$1,243 | 31,653 | - | - | - | - |
$1,243 31,653 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,921 Cost: $9,700 |
$2,921 | 75,615 | - | - | - | - |
$2,921 75,615 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $13,560 Cost: $28,500 |
$13,560 | - | - | - | - | - |
$13,560 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $155,672 Cost: $232,934 |
$127,515 | 3,350,820 | $25,950 | 398 | $2,207 | - | $127,515 3,350,820 kWh |
$25,950 398 MMBtu |
$2,207 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $48,735 Cost: $50,887 |
$45,060 | 841,734 | $1,468 | 398 | $2,207 | - | $45,060 841,734 kWh |
$1,468 398 MMBtu |
$2,207 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes |