IAC logo
IAC Assessment: OR0191
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0191
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1993
Principal Product PCV Pipe
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 70,000,000 Pounds
Production Hrs. Annual 8,520
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $435,351 11,413,834 kWh $0.04
TOTAL ENERGY COSTS $435,351
RECOMMENDED SAVINGS* $62,115 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,116
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,984
Cost:
$400
$7,984 243,259 $7,984
243,259
kWh
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$438
Cost:
$567
$438 12,016 $438
12,016
kWh
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,156
Cost:
$7,425
$3,156 86,460 $3,156
86,460
kWh
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,843
Cost:
$12,300
$5,843 - $5,843
-
kWh
05: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$36,422
Cost:
$41,000
$36,422 1,110,492 $36,422
1,110,492
kWh
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,272
Cost:
$13,663
$8,272 252,345 $8,272
252,345
kWh
TOTAL RECOMMENDED Savings:
$62,115
Cost:
$75,355
$62,115 1,704,572 $62,115
1,704,572
kWh
TOTAL IMPLEMENTED Savings:
$53,116
Cost:
$55,630
$53,116 1,618,112 $53,116
1,618,112
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage