IAC Assessment: OR0194
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0194
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1993
Principal Product Frozen Vegetables
NAICS n/a
SIC 2037 - Frozen Fruits And Vegetables
Sales $100,000,000-$500,000,000
# of Employees 560
Plant Area (Sq.Ft.) 0
Annual Production 107,281 Tons
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,050,748 22,650,645 kWh $0.05
Natural Gas $364,952 138,192 MMBtu $2.64
TOTAL ENERGY COSTS $1,415,700
RECOMMENDED SAVINGS* $75,731 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,785
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$23,338
Cost:
$2,500
- - $23,338 8,840 -
-
kWh
$23,338
8,840
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,588
Cost:
$2,790
$6,588 174,678 - - $6,588
174,678
kWh
-
-
MMBtu
03: 2.5123 REDUCE FLUID FLOW RATES Savings:
$17,513
Cost:
$22,030
$17,513 464,537 - - $17,513
464,537
kWh
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,410
Cost:
$9,422
- - $7,410 2,807 -
-
kWh
$7,410
2,807
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,934
Cost:
$20,000
$10,934 255,276 - - $10,934
255,276
kWh
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,898
Cost:
$11,300
$4,898 129,836 - - $4,898
129,836
kWh
-
-
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,962
Cost:
$8,554
$2,962 62,427 - - $2,962
62,427
kWh
-
-
MMBtu
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,088
Cost:
$6,000
$2,088 - - - $2,088
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$75,731
Cost:
$82,596
$44,983 1,086,754 $30,748 11,647 $44,983
1,086,754
kWh
$30,748
11,647
MMBtu
TOTAL IMPLEMENTED Savings:
$51,785
Cost:
$44,530
$28,447 719,813 $23,338 8,840 $28,447
719,813
kWh
$23,338
8,840
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas