IAC Assessment: OR0197
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0197
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1994
Principal Product Manufactured Homes
NAICS n/a
SIC 2452 - Prefabricated Wood Buildings
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 0
Annual Production 1,750 Pieces
Production Hrs. Annual 2,750
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,350 611,958 kWh $0.04
Natural Gas $32,826 8,006 MMBtu $4.10
TOTAL ENERGY COSTS $60,176
RECOMMENDED SAVINGS* $13,751 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,393
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,340
Cost:
$3,000
$2,340 51,583 - - $2,340
51,583
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$53
Cost:
$201
$53 1,172 - - $53
1,172
kWh
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$395
Cost:
$3,200
$395 8,499 - - $395
8,499
kWh
-
-
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$410
Cost:
$1,200
$410 - - - $410
-
kWh
-
-
MMBtu
05: 2.6213 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS Savings:
$10,553
Cost:
-
- - $10,553 2,574 -
-
kWh
$10,553
2,574
MMBtu
TOTAL RECOMMENDED Savings:
$13,751
Cost:
$7,601
$3,198 61,254 $10,553 2,574 $3,198
61,254
kWh
$10,553
2,574
MMBtu
TOTAL IMPLEMENTED Savings:
$2,393
Cost:
$3,201
$2,393 52,755 - - $2,393
52,755
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas