Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1994
Principal Product lead acid batteries
NAICS n/a
SIC 3691 - Storage Batteries
Sales $10,000,000-$50,000,000
# of Employees 280
Plant Area (Sq.Ft.) 198,000
Annual Production 195 Pieces
Production Hrs. Annual 5,928
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $689,273 20,565,065 kWh $0.03
Natural Gas $248,791 60,759 MMBtu $4.09
TOTAL ENERGY COSTS $938,064
RECOMMENDED SAVINGS* $293,573 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $224,117
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Administrative Changes
$ kWh $ lb $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,043
Cost:
-
$4,043 123,974 - - - - $4,043
123,974
kWh
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,121
Cost:
$1,763
$1,121 33,411 - - - - $1,121
33,411
kWh
-
-
lb
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,007
Cost:
$12,425
$3,007 88,511 - - - - $3,007
88,511
kWh
-
-
lb
-
-
$
04: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$69,996
Cost:
$30,000
- - - - $69,996 - -
-
kWh
-
-
lb
$69,996
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$51,397
Cost:
-
- - - - $51,397 - -
-
kWh
-
-
lb
$51,397
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,009
Cost:
$45,344
$11,009 - - - - - $11,009
-
kWh
-
-
lb
-
-
$
07: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$153,000
Cost:
$106,000
- - $153,000 789,000 - - -
-
kWh
$153,000
789,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$293,573
Cost:
$195,532
$19,180 245,896 $153,000 789,000 $121,393 - $19,180
245,896
kWh
$153,000
789,000
lb
$121,393
-
$
TOTAL IMPLEMENTED Savings:
$224,117
Cost:
$137,763
$1,121 33,411 $153,000 789,000 $69,996 - $1,121
33,411
kWh
$153,000
789,000
lb
$69,996
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Administrative Changes