Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1995 |
Principal Product | plated parts |
NAICS | n/a |
SIC | 3471 - Plating And Polishing |
Sales | $5,000,000-$10,000,000 |
# of Employees | 52 |
Plant Area (Sq.Ft.) | 20,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 6,168 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $180,525 | 5,339,097 | kWh | $0.03 |
Natural Gas | $36,586 | 7,661 | MMBtu | $4.78 |
TOTAL ENERGY COSTS | $246,745 | |||
RECOMMENDED SAVINGS* | $28,525 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,783 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (haz) | Primary Raw Material | Electricity Usage | Natural Gas | Solid Waste (haz) | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $196 Cost: $376 |
$196 | 4,396 | - | - | - | - | - | - |
$196 4,396 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1224 REPLACE BOILER |
Savings: $3,686 Cost: $17,870 |
- | - | $3,686 | 808 | - | - | - | - |
- - kWh |
$3,686 808 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $8,136 Cost: $32,460 |
- | - | $8,136 | 1,784 | - | - | - | - |
- - kWh |
$8,136 1,784 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $2,920 Cost: $240 |
- | - | - | - | - | - | $2,920 | - |
- - kWh |
- - MMBtu |
- - lb |
$2,920 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $13,587 Cost: $54,901 |
$(-106) | (-2,052) | $(-907) | (-168) | $14,600 | 75,800 | - | - |
$(-106) (-2,052) kWh |
$(-907) (-168) MMBtu |
$14,600 75,800 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,525 Cost: $105,847 |
$90 | 2,344 | $10,915 | 2,424 | $14,600 | 75,800 | $2,920 | - | $90 2,344 kWh |
$10,915 2,424 MMBtu |
$14,600 75,800 lb |
$2,920 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,783 Cost: $55,277 |
$90 | 2,344 | $(-907) | (-168) | $14,600 | 75,800 | - | - | $90 2,344 kWh |
$(-907) (-168) MMBtu |
$14,600 75,800 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (haz) | Primary Raw Material | Electricity Usage | Natural Gas | Solid Waste (haz) | Primary Raw Material |